1 weekStart with a one-week proof on one processStart with a one-week proofWatch the latest Stanford AI & Investment session

Book a call (opens in a new tab)

ManufacturingWhat we do for manufacturers, and a client case

Manufacturing can be improved massively, in output and in quality.

We map how orders, machines and quality really run from the plant’s own data, measure the gap to best practice, and check every process as it happens.

Our manufacturing clientsPlants we have worked inside

Manufacturers who work with us.

  • Northexzone
  • Welektrik

What a manufacturer can gainPublished results, with their sources

The gains are documented.

  • 85%

    world-class OEE, vs ~60% typical: every loss mapped and owned

    Nakajima, “Introduction to TPM,” Japan Institute of Plant Maintenance

  • 10–30%

    higher throughput where Industry 4.0 is done right

    McKinsey, “Capturing the true value of Industry 4.0,” 2022

  • 15–30%

    higher labor productivity: manual work taken out of the loop

    McKinsey, “Capturing the true value of Industry 4.0,” 2022

  • 10–20%

    lower cost of quality with live, digital quality control

    McKinsey, “Industry 4.0: How to navigate digitization of the manufacturing sector,” 2015

What manufacturers needOn time, audit-ready, safe

Built for how plants really run.

  • On-time delivery

    Orders shipped when promised, bottlenecks found early.

  • Audit-ready quality

    Evidence for every unit, ready in a day, not weeks.

  • Safer floors

    Danger-zone entries and near misses tracked live.

  • Low-risk start

    One plant, 10 weeks. Runs on-prem with open-source models.

Case in pointExplosion-protected equipment manufacturer, Istanbul

$10.7–11.3M saved a year.

Results at month 12. On time, every unit audit-ready, safer floors.

  • 75% → 95%

    on-time delivery

    Measured by the client: May–Oct 2026 vs the 12 months to Dec 2025

  • 3 weeks → 1 day

    audit evidence prep

    Measured by the client

  • 4.8 → 0.9

    danger-zone entries per 1,000 hours

    Measured by the client, against a four-week shadow baseline

How we got thereThe Five Step Method in the plant

From the plant’s own data to live checks on every process.

  1. Step 01: Collecting Data

    Connect ERP, CRM and other systems; capture hidden work in Excel, e-mail and chat; add embedded data and live camera feeds

  2. Step 02: Mapping Processes and Data Flow

    Map processes as they really run; map the strategy behind them; trace the data supply chain

  3. Step 03: Gap Analysis

    Measure the gap to best practice; surface major red flags in processes and data flow

  4. Step 04: Optimal Design

    Design optimal processes and data flow; build the transformation playbook

  5. Step 05: Implementation Live Assurance

    Run live QC on every process and data flow; reject and QA flagged processes and data; score the enterprise in real time against the optimal design