Oil and gasWhat we do, and an illustrative case

Oil and gas operations can be improved massively, safely, starting with one site in 10 weeks.

We map how the work really runs from your own systems, measure the gap to best practice, and check every case as it happens.

What a site can gainPublished results, with their sources

The gains are documented.

  • $84M

    lost per site a year to unplanned downtime, oil & gas average

    Siemens, “The True Cost of Downtime 2022” (32 hours a month at $220K an hour)

  • 30–50%

    less unplanned downtime with mature predictive maintenance

    McKinsey, “Manufacturing: Analytics unleashes productivity and profitability,” 2017

  • 30%

    of incidents in maintenance: process plants, with permit failures in 20%+

    UK HSE, “Dangerous Maintenance,” as cited in IChemE Symposium Series

  • 2 in 3

    turnarounds overrun 10%+ on cost and schedule, or trip at startup

    AP-Networks turnaround benchmarks (more than two-thirds of turnarounds), via Digital Refining

What oil and gas operators needSafety-driven and business-driven

Built for how you really run.

  • Safety first

    Permit-to-work and MOC gaps caught before incidents.

  • Reliable assets

    Fewer unplanned shutdowns, maintenance on condition.

  • More throughput

    Higher uptime and turnarounds on time and budget.

  • Low-risk start

    One site, 10 weeks. Runs on-prem with open-source models.

Illustrative caseOil & gas site: maintenance, permits, uptime

$4.2M saved a year.

One site, 10 weeks. An illustrative case, not an AIx2 client result: Illustrative. Average oil & gas site: 32 h of unplanned downtime a month at $220K an hour (Siemens, True Cost of Downtime 2022). Assumes 5% fewer hours: 1.6 h × 12 × $220K = $4.2M a year.

  • 32 h/month → 30.4 h

    unplanned downtime

    Siemens, True Cost of Downtime 2022; assumes 5% fewer hours

  • 30% → 35%

    wrench time

    Typical wrench time is 25–35%, best practice about 55% (D. Palmer, Maintenance Planning and Scheduling Handbook). Assumes a 5-point gain.

  • spot checks → 100%

    permits checked for gaps

    30% of reported chemical-industry incidents are maintenance-related, with permit-to-work failures in over 20% of them (UK HSE, Dangerous Maintenance).

How we get thereThe ten weeks, step by step

From your own data to live checks on every case.

  1. Step 01: Collecting Data

    Connect SAP PM, DCS and PI historian; add permit, MOC and inspection records; capture shift logs, Excel and e-mail

    Weeks 1–2

  2. Step 02: Mapping Processes and Data Flow

    Map work orders from notification to close; map permits and MOCs as they really run; trace data from sensor to decision

    Weeks 3–4

  3. Step 03: Gap Analysis

    Find repeat failures and what they cost; flag permit, MOC and backlog risks

    Weeks 5–6

  4. Step 04: Optimal Design

    Fix the costliest repeat failures first; redesign permit and work-order flow

    Weeks 7–8

  5. Step 05: Implementation Live Assurance

    Run live QC on every work order and permit; flag safety and reliability risk early; track savings against the baseline

    Weeks 9–10